Copyright © Hrvatski hidrografski institut-Split

Production of final recordings and reports of the performed state

Just as land buildings are subject to the obligation to create a snapshot of the completed state, a report by which the building is recorded in the real estate cadastre, i.e. the cadastre of lines, so maritime buildings must, in accordance with legal provisions, be recorded in the official maritime publications of the Croatian Hydrographic Institute (HHI; maritime charts, compasses, ads for seafarers, etc.)

Snimak izvedenog stanja luke Postira nakon izgradnje (dio elaborata koji ovjerava HHI)
A snapshot of the rendered state of Postira port after construction (part of the study certified by HHI)

The report on the derived state of the marine structure is submitted to HHI for review and verification, after which this structure and all changes are recorded in new editions of maritime charts. The register of such measurements as well as the measurements for the creation of project documentation performed by Authorized Legal Entities for Hydrographic Activity (OPO) can be followed on the following website:
https://hhi.maps.arcgis.com/apps/dashboards/7876118756b7431da655561b7e8bd601