Copyright © Hrvatski hidrografski institut-Split

Hydrographic images of the zero (initial) state of the underwater construction site

Before starting the construction of any major subsea construction site, it is important to take a zero-state survey to precisely define the terrain before any excavation or construction activity. This is important for very simple reasons: the recordings from the project documentation are often inadequate or outdated, so it is difficult for the contractor to prove the quantities of excavation and embankment later. Also, the creation of detailed implementation projects that are done immediately before implementation will be based on current, real and precise data. By recording the zero state of the seabed with a high-resolution multi-beam depth gauge and creating a precise 3D model of the sea or river bottom, these problems were solved and all participants (investor, designer,

3D model korita (desna obala) rijeke Neretve nakon i prije radova nasipanja
3D model of the bed (right bank) of the Neretva River after and before the embankment works
3D modeli podmorja prije i nakon radova jaružanja (Bršica, Zaljev Raša)
3D models of the seabed before and after dredging works (Bršica, Raša Bay)